Commission detail

Core Performance Index

A weighted index of leading measures with banded signal charts and a Monday reading order for finance and operations rooms.

Core Performance Index
Index design + signal panels 4–6 weeks Kota Kinabalu · hybrid Malaysia Quote by scope

Who it is for

Controllers, FP&A leads, and operations directors who already drown in KPI packs and need one honest index the room can stand behind — plus early-warning charts that move before the lagging P&L does.

Result

You leave with a documented index formula, a primary wall or screen composition, supporting signal charts with green–amber–red bands, and a short facilitator script for the weekly huddle.

Scope included

  • Metric inventory workshop (on-site in Kota Kinabalu or video for peninsula sites)
  • Draft weights with plain-language rationale and named owners
  • Two design rounds of the index panel and signal suite
  • Pilot reading with your facilitator
  • Source files, colour rules, and a 90-day recalibration checklist

Scope excluded

  • Ongoing data engineering or warehouse builds
  • Software licences or hosted analytics seats
  • Unlimited redesign after sign-off

Process

  1. Discovery — we sit with the people who argue the numbers and list leading versus lagging measures.
  2. Formula draft — weights, exclusions, and edge cases written as sentences, not only spreadsheet cells.
  3. Visual compose — index hero panel plus three to five signal charts tested for distance reading.
  4. Pilot & handover — two live huddles, then the kit moves to your owners.

Duration & delivery

Typical builds run four to six weeks depending on data access and stakeholder calendars. Work is hybrid: at least one on-site or co-located session in Sabah when travel allows, with remote reviews for peninsula stakeholders.

Preparation

Bring the last two reporting packs, the current target sheet, and one person who can explain where each number is born. Lock a decision owner before week two.

Constraints

We cap an index at a small set of drivers. If a measure cannot be refreshed on your stated cycle, it stays off the index and may appear only as a supporting note.

Pricing basis

Quote-based on number of source systems to reconcile, stakeholder count, and whether wall print production is included. Deposits and refund rules are on the refund page.

Next step

Start an index brief with the room name, cycle, and the three measures that surprise you most often.

Request this commission